Automotive keyless system receiver vehicle-mounted installation parts SPCC
Processed with dedicated welding tips and passed strict standards through inspection with dedicated inspection jigs.
The nut welding standard requires a coaxiality of 0.3 and a mounting angle of 45° ± 2°. This is managed and cleared through processing with dedicated welding tips and shipping inspections using dedicated inspection jigs. 【Process】 Process: Progressive press (150tw) → Nut welding → Trivalent zinc plating → Inspection and packaging → Shipping. For more details, please contact us or refer to the catalog.
- Company:大喜金属製作所 蘇州大喜金属製品有限公司
- Price:Other